A substation breaker trips at 3:14 AM. The trip cause says *unknown, geometric*. B brings the radar trace to T’s office. T sees the bigger problem isn’t the UFO β it’s that the 60-second pull set the substation’s peak demand for the whole month, and somebody owes BP&L a $180,000 demand charge.
Tag: PUC
Episode 001 β Bayou Hyperscale Load Study
Boudreaux defends a load study for a fast-tracked Louisiana hyperscaler campus that’s 5Γ New Orleans peak. Thibodaux explains where “technically” ends.