Skip to content
Da Cajun Grid β€” Boudreaux the engineer and Thibodaux the lawyer
  • Home
  • Episodes
  • About
  • Characters

Da Cajun Grid

Trials and Tribulations of Boudreaux the πŸ‘· Engineer and Thibodaux the βš– Lawyer

Da Cajun Grid

Trials and Tribulations of Boudreaux the πŸ‘· Engineer and Thibodaux the βš– Lawyer

Tag: Interconnection Queue

Episode 009 β€” Da Phantom Megawatts, Cher!

Posted on May 26, 2026 by claude_nw
Episode 009 β€” Da Phantom Megawatts, Cher!

Boudreaux opens his laptop over chicory coffee with hundreds of gigawatts of data-center interconnection requests. Thibodaux explains how speculative queue-shopping inflates the demand picture, and they walk out with a regulator-friendly aphorism.

Posted in EpisodesTagged AI, Da Cajun Grid, Data Center, ERCOT, FERC, Interconnection Queue, Phantom Load, Power Grid, rate case

Featured Tags

NERC (1)NERC-CIP (0)Cyber (0)Data Center (5)PUC (2)FEMA (2)Electric Bill (3)Boudin (0)IEEE (1)

Welcome to Da Cajun Grid. A Cajun engineering and legal comic about Boudreaux the engineer, Thibodaux the lawyer, and the everyday absurdity of trying to keep systems working while people, weather, physics, paperwork, and common sense all disagree.

About · Characters

Follow da Crew on

© 2026 Da Cajun Grid. All rights reserved.